FAQs

What are emergency wastewater storage tanks?

Emergency storage tanks temporarily hold wastewater during an unexpected outage at a pump station. This provides time for crews to restore operations before wastewater can overflow from the network.

Will the storage tanks be smelly?

We don’t expect any odour issues due to these works. The storage pipe is connected to the existing wastewater pump station, like the current pipe network is. Odour controls for the existing pump station will be assessed and upgraded if needed during these works. The pipes and tanks will only be used if there’s a pump blockage or loss of power to the pump station - most of the time the emergency storage pipes and tanks will be empty.

What will construction involve?

Construction will involve excavating the site, installing prefabricated tanks and associated pipework, connecting the tanks to the wastewater network, and reinstating the site following completion.

Can I get in and out of my driveway during construction?

Yes. We will maintain access at all times when we are not on site. At times during the work we may need to restrict access for safety as machinery moves about.

How will nearby residents be kept informed?

The project team will communicate directly with residents, nearby property owners, Glenview School and other affected stakeholders before and during construction.

Will the tanks always contain wastewater?

No. Most of the time the tanks will remain empty and will only be used during emergency situations.

Why are the tanks being built here?

The tanks need to be located close to the wastewater pump station they support so they can provide effective emergency storage capacity.

Will the digging cause vibration at my house?

Any large construction works in the road may cause vibration at times. The level will depend on the type of work and the soil type in the area. Before we start we’ll visit nearby homeowners and do an assessment of properties to identify any issues which may arise from the works.

How long will construction take?

Works are expected to take approximately four to five months, weather permitting.